Thursday, February 23, 2012

WEEK 5 & 6


OBJECTIVE :
1.      Finalize sensor probe design

PROCEDURE :

  •        Below is the back side of SMT package LED. this package quite difficult to solder because of the size but it its excel in-term of  performance and for sensor placement.


       


  •   Then technique to solder SMT package is, first to put a bit of solder iron to make it easy to stick later on





  •            This is where the LED will be placed 


       

  • Below shows the connection of RED and INFRARED LED. The red wire soldered to red led and the green wire is ground while the orange wire soldered to infrared led



  • Below is Light to Frequency sensor TSL235R 





  • As usual the red for VCC, green for ground and  orange wire is the output of the sensor to be connected to DSPIC30F2012 later




  •  By using a velcro tape. Two hole is made using puncher, one for sensor TRL235R and the other for red and infrared LED

  • There are 5 wire all together (LED+SENSOR). by using DB9 connector it is more durable and easy to connect to the main board





CONCLUSION

  • SMT LED package need more practice to solder. The overall process took two weeks to finished 

No comments:

Post a Comment