OBJECTIVE :
1. Finalize sensor probe design
PROCEDURE :
- Below is the back side of SMT package LED. this package quite difficult to solder because of the size but it its excel in-term of performance and for sensor placement.
- Then technique to solder SMT package is, first to put a bit of solder iron to make it easy to stick later on
- This is where the LED will be placed
- Below shows the connection of RED and INFRARED LED. The red wire soldered to red led and the green wire is ground while the orange wire soldered to infrared led
- Below is Light to Frequency sensor TSL235R
- As usual the red for VCC, green for ground and orange wire is the output of the sensor to be connected to DSPIC30F2012 later
- By using a velcro tape. Two hole is made using puncher, one for sensor TRL235R and the other for red and infrared LED
- There are 5 wire all together (LED+SENSOR). by using DB9 connector it is more durable and easy to connect to the main board
CONCLUSION
- SMT LED package need more practice to solder. The overall process took two weeks to finished
No comments: